Tub-to-Shower Conversion in Dallas: 7 Things to Know Before You Remove the Tub
Many Dallas-Fort Worth homeowners use their bathtub a few times a year, if that, while stepping over the tub wall every day to shower. Replacing the tub with a walk-in shower is one of the most popular bathroom projects we do. Here's what to know before the tub comes out.

1. Keep at least one tub in the house
If your home has more than one bathroom, converting one tub is usually fine for resale. Families with young children often want a tub, so many homeowners keep one in a hall or secondary bathroom and convert the primary.
2. The drain usually has to move
A tub drain sits at one end of the tub. A shower drain is often centered, or runs along one wall as a linear drain. In many DFW homes built on a concrete slab, that means cutting the slab to move the drain. It's routine work, but it should be planned and included in the estimate.
3. Waterproofing is what matters most
The tile is what you see. The waterproofing behind it is what protects your home. A shower needs a properly sloped pan and a waterproof layer on the walls and floor. When this step is rushed, water gets into the wall and the subfloor, and you end up with rot and mold.
4. Curbless or low curb?
A curbless (zero-entry) shower is easier to walk into and works well for aging in place. It takes more planning, because the floor has to slope to the drain. A low curb is simpler and still much easier to step over than a tub wall.
5. Glass door, fixed panel or open
A frameless glass door looks clean and keeps water in. A fixed glass panel with an open end is easier to clean. Your choice depends on the shower size and where the shower head sits.
6. Plan storage and safety now
Recessed niches for shampoo, a bench or fold-down seat, a hand shower on a slide bar and blocking in the walls for future grab bars are all easiest to add while the walls are open.
7. Check what's behind the old tub
When the old tub and surround come out, we often find soft drywall, rotted wood or mold from years of small leaks. It's better to find it now and fix it right than to tile over it. If mold is found, it's handled under Texas mold rules before the new shower goes in.
How long does it take?
A typical tub-to-shower conversion takes about one to two weeks once materials are on site, depending on the drain work, tile and glass. We give you a schedule up front.
Why homeowners choose Ori-Builders
Ori-Builders has 30+ years of construction experience in Dallas-Fort Worth. We handle the whole job: demolition, plumbing, waterproofing, tile, glass and paint. See our bathroom remodeling in Dallas, Plano, Frisco and Richardson.
Ready to lose the tub? Call 469-331-8664 for a free estimate.




Comments